PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Surveying for the underground plumbing Facing North-West (800x600).jpg Installed temporary electrical outler Facing North   (800x600).jpg Installing temporary lighting Facing East (800x600).jpg Installing underground piping Facing South-East (800x600).jpg Leveling the soil for the temporary stairs Facing West (800x600).jpg Underground Storm Sewer between column line A-4 and B-4 Facing South-East (800x600).jpg Verizon Removing the lines Facing East (800x600).jpg Verizon removing the lines Facing South-East (800x600).jpg Installing rebar mats at Elev. 4-Stair 2 Facing South-West (800x600).jpg
Previous pageNext page Leveling the soil for the temporary stairs Facing West (800x600)
Leveling the soil for the temporary stairs Facing West (800x600)